海外直播b站

海外直播b站 has mandated Procova Incto carry out the following project: McIntyre Medical / 23-002听- Renovation of room 334 (third floor).

The project consists of the renovation of room 334 and the installation of 261 exam desks. It includes the installation of lockers on the second and third floors.

Project manager:听Wendy Rivera -听wendy.rivera [at] mcgill.ca

Classified as: Mcintyre building, McIntyre
Published on: 22 Jan 2024

Project: Centennial Centre / 23-035 - Installation of temporary classrooms.

The project consists of the installation of a temporary classroom complex near the Centennial Centre at the Macdonald Campus.

Temporary classroom modules on a field

Classified as: Centennial Centre
Published on: 30 Nov 2023

海外直播b站 has mandated Corenov Constructeurs Incto carry out the following project: Wong Building / 20-094 - Space simulator.

Project manager:听Mona Modarressi - mona.modarressi [at] mcgill.ca

Assistant project managers:听Mark Grzywacz - mark.grzywacz [at] mcgill.ca; Thomas Perreault - thomas.perreault [at] mcgill.ca

Construction start:听December 2023

Classified as: Wong Building
Published on: 30 Nov 2023

海外直播b站 has mandated CORENOV CONSTRUCTEURS to carry out the following project: Parasitology Building / 19-136 - JELF Cestari.

The project consists of the renovation of labs P103 and P209 on the first and second floor of the Parasitology Building at the Macdonald Campus.

Project manager:听Biagio D'Onofrio - biagio.donofrio [at] mcgill.ca

Assistant project manager:听Claudia Carpanzano - claudia.carpanzano [at] mcgill.ca

Classified as: parasitology
Published on: 30 Nov 2023

海外直播b站 has mandated CORENOV CONSTRUCTEURS to carry out the following project: Centennial Centre / 20-098 - JELF Gillung.

The project consists of the renovation of labs 033 and 037 in the basement of the Centennial Centre at the Macdonald Campus.

Project manager:听Biagio D'Onofrio - biagio.donofrio [at] mcgill.ca

Assistant project manager:听Claudia Carpanzano - claudia.carpanzano [at] mcgill.ca

Classified as: Centennial Centre
Published on: 20 Nov 2023

海外直播b站 has mandated St-Denis Thompson to carry out the following project: Montreal Neurological Institute / 22-035 - Priority building envelop repairs, balustrade.

The project consists of removing the stone balustrade.

Project manager:听Johanne Guertin - Johanne.guertin [at] gph-inc.com

Assistant project manager:听Gabriel Fortin -听Gabriel.fortin [at] gph-inc.com

Construction start date:听November 14, 2023

Classified as: MNI, Montreal Neurological Institute
Published on: 8 Nov 2023

海外直播b站 has mandated Planit Construction to carry out the following project:听MNI, Residences, Currie Gym, Milton Gate and Burnside Parking / 18-089 Lot 1 - Infrastructure for new parking equipment.

The project consists of infrastructure work that is required for the installation of new parking equipment for various parking lots on the 海外直播b站 Downtown Campus: Montreal Neurological Institute, Residences, Milton Gate, Currie Gym and Burnside Garage.

Published on: 8 Nov 2023

海外直播b站 has mandated Corenov Constructeurs to carry out the following project: Macdonald Stewart Building (Macdonald Campus) / 17-088 Basu Lab and Kitchenette.

The project consists of the renovation of rooms MS3-047 and MS3-048 on the third floor of Macdonald Stewart Building.

Project manager:听Mark Ouimet 鈥撎mark.ouimet [at] mcgill.ca

Assistant project manager: Claudia Carpanzano听-听Claudia.carpanzano [at] mcgill.ca

Classified as: Macdonald Campus, Macdonald Stewart Building
Published on: 19 Sep 2023

海外直播b站 has mandated Ardec Construction Inc. to carry out the following project: Montreal Neurological Institute / 18-121 - Cyclotron aerial exhaust.

The project consists of installing the aerial conduit to replace the existing one at the Montreal Neurological Institute hospital.

Project manager:听Eric Boutet, CIMA+ - eric.boutet [at] cima.ca听">eric.boutet [at] cima.ca

Classified as: MNI, Montreal Neurological Institute
Published on: 19 Sep 2023

海外直播b站 has mandated Corenov Constructeurs to carry out the following project: Macdonald Stewart Building (Macdonald Campus) / 20-021 JELF Roy.

The project consists of the renovation of lab MS2-094A on the second floor of the Macdonald Stewart Building.

Project manager:听Mark Ouimet 鈥撎mark.ouimet [at] mcgill.ca

Assistant project manager: Claudia Carpanzano听-听Claudia.carpanzano [at] mcgill.ca

Classified as: Macdonald Campus, Macdonald Stewart Building
Published on: 19 Sep 2023

海外直播b站 has mandated Immobilier Belmon to carry out the following project: Currie Gym / 16-140 - Renovation of classrooms W305 and W409.

The project consists of the upgrade of classrooms W-409 and W-305 at Currie Gym to improve the learning experience, including new seating arrangement, Audio-Visual equipment, and lighting.

Project manager:听Jo茅 Normandeau 鈥 joe.normandeau [at] gph-inc.com

Classified as: Currie Gym
Published on: 17 Aug 2023

海外直播b站 has mandated NR Brosseau to carry out the following project:听McIntyre Medical Building / 21-008 - JELF, Chen.

The project consists of minor renovations of laboratory rooms 712, 723 and 726.

Project manager: Andrea Gore -Andrea.gore [at] mcgill.ca

Assistant project manager: Ellie Tayebi -听Ellie.tayebi [at] mcgill.ca

Construction start date:听July 7, 2023

Classified as: McIntyre, Mcintyre building
Published on: 6 Jul 2023

海外直播b站 has mandated Procova Inc. to carry out the following project: McIntyre Medical Building / 15-104 - Modification of the fourth floor electrical room distribution.

This project includes installing a second transformer to provide the required additional electrical capacity for the building and to update the emergency electrical distribution within the building.

Project manager:听Emika Marinacci -听Emika.marinacci [at] mcgill.ca

Classified as: Mcintyre building, McIntyre
Published on: 6 Jul 2023

海外直播b站 has mandated Corenov Constructeurs to carry out the following project:听Morrice Hall / 22-038 - Priority building envelop repairs, lower roof.

The project consists of the installation of a steel structure in the library to stabilize the roof and exterior walls of the turret.

Project Manager and听Assistant Project Manager:

Classified as: Morrice Hall
Published on: 27 Jun 2023

Please be advised that Facilities Management and Ancillary services (FMAS) has mandated Belmon Construction to carry out the following project:18-101 Strathcona Music - Renovation of Percussion Studios for Rooms C101 to C109 (lot 1).

The project consists of a complete renovation of the nine percussion rooms, including new layouts, acoustical treatment, audiovisual equipment, new mechanical and electrical systems, and custom storage for the instruments.

Classified as: Strathcona Music, renovation
Published on: 20 Jun 2023

Pages

Back to top